Portfolio Project Management

For municipalities developing areas

A grip on every area development.

Portfolio Project Management brings progress reports, planning, land development budgets, risk analyses, subsidies and hours together per project. Project managers, controllers and management work with the same up-to-date figures, and the dashboard shows what needs attention.

  • Two-factor authentication for everyone
  • Permissions per colleague and tab
  • Works with BBV and RISMAN
Scroll and see how it comes together

How Portfolio Project Management works

01Projects

One project overview as the basis

Every project appears once in the project overview, with the project managers and the iFinance order numbers. You link reports, planning, land development budgets, risk analyses and subsidies to that project. If something is not linked yet, PPM looks it up by order number or name.

  • One source for all tabs
  • The next step with every project
  • Data quality shows what is still unlinked

02Dashboard

Seeing what needs attention, the most serious first

The dashboard calculates live with the data from all tabs: the status of the portfolio, budget versus forecast, the net present value and the required risk reserve. Every point of attention links to the tab where you resolve it.

  • Management by exception
  • Agenda for 30 or 90 days
  • Export to Excel and a print version

03Planning

Every milestone and decision in view on time

Record activities, milestones, decisions and deadlines per project. The timeline puts all projects side by side and the agenda shows what needs to happen in the coming weeks. You copy milestones into the progress report.

  • Timeline of all projects
  • Agenda per week and per month
  • What is overdue is at the top

04Land development and Subsidies

Calculating under the BBV rules, down to the net present value

The calculation model works with sub-areas, the residual land value and the cash flow per year, with scenarios, a sensitivity analysis and a BBV check. In the subsidy register you keep track of applications, deadlines, accountability and payments.

  • BBV check on discount rate, duration and updates
  • Loss provision visible right away
  • AI reads schemes and grant decisions

05Risk analysis

A risk reserve you can substantiate

You record risks using RISMAN, from seven perspectives. A Monte Carlo simulation draws ten thousand times whether each risk occurs and what it then costs. So you see the probability of every amount and reserve at P80 or P90 instead of by gut feeling.

  • Minimum, most likely and maximum per risk
  • S-curve with P50, P80 and P90
  • Export to Excel for accountability

06Reports

The progress report in a fixed structure

The editor guides you through every section, from the assessment per control aspect to finance, production, risks, participation, decisions and actions. Everything is saved automatically. You download the result as PDF or PowerPoint.

  • Traffic light per control aspect: GOTIK and risks
  • Permissions per report
  • Ready for the executive and the council

Eight tabs, one sign-in

Everything an area development needs, in one place

Switch on what you use. The administrator decides per colleague and per tab who can view and who can edit.

Management information, live from all tabs

Key figures, points of attention, an agenda and a project matrix for the entire portfolio. Filter by project, project manager, status or programme.

  • Points of attention with a link to the solution
  • Matrix with assessment per control aspect
  • On the phone as clear cards
Dashboard
Projectstatus5 projecten 3 op schema 1 aandacht 1 vertraagd
Krediet tegenover prognose€ 104,3 mlnKrediet € 103,9 mln · +€ 0,4 mln · 1 project boven krediet
Netto contante waarde€ 5,4 mlnVerliesvoorziening € 0,8 mln
Risicoreservering (P90)€ 9,3 mlnUit de risicoanalyse, per project

Aandachtspunten

5
  • KritiekPrognose boven kredietPolderrand · De prognose ligt € 1,2 mln boven het beschikbare krediet van € 26,5 mln.
  • KritiekVerliesgevende grondexploitatiePolderrand · NCW −€ 0,8 mln. Neem een verliesvoorziening op (BBV).
  • AandachtRapportage ouder dan een kwartaalStationskwartier · De laatste voortgangsrapportage is van 3 juli.
  • AandachtUren boven begrotingStationskwartier · De prognose komt 9% boven de begrote 2.100 uur uit.

Projectenmatrix

ProjectStatusBeoordeling per beheersaspectNCW
Polderrand35%VertraagdGeld: roodOrganisatie: oranjeTijd: roodInformatie: groenKwaliteit: oranjeRisico’s: oranje−€ 0,8 mln
Stationskwartier48%AandachtGeld: groenOrganisatie: groenTijd: oranjeInformatie: oranjeKwaliteit: groenRisico’s: oranje€ 2,6 mln
Rivierfront72%Op schemaGeld: groenOrganisatie: groenTijd: groenInformatie: groenKwaliteit: groenRisico’s: oranje€ 2,1 mln
Molenhoek55%Op schemaGeld: groenOrganisatie: groenTijd: groenInformatie: groenKwaliteit: groenRisico’s: groen€ 0,9 mln
Parkzoom88%Op schemaGeld: groenOrganisatie: groenTijd: groenInformatie: groenKwaliteit: groenRisico’s: groen€ 0,6 mln

Gesorteerd op aandacht · elke kolom is te sorteren

Example with made-up data

Progress reports without copy and paste

An editor with autosave, a report view and export to PDF and PowerPoint. When two colleagues work at the same time, nothing gets lost.

  • Traffic light per control aspect
  • Milestones can be copied from the planning
  • Access per report
Reports
Automatisch opgeslagen
  1. Projectgegevens (ingevuld)
  2. Samenvatting (ingevuld)
  3. Resultaten (ingevuld)
  4. Planning & mijlpalen (ingevuld)
  5. Financiën (ingevuld)
  6. Kwaliteit (ingevuld)
  7. Risico’s (bezig)
  8. Kansen
  9. Participatie
  10. Communicatie
  11. Besluiten
  12. Acties
  13. Afsluiting
  14. Uren
Voortgangsrapportage · 3e kwartaal 2026

Stationskwartier

Projectleider Mark de Graaf · Actieve grondexploitatie · Planvoorbereiding
Aandacht48% gereed
GeldOp koersPrognose € 0,2 mln onder krediet
OrganisatieOp koersTeam op sterkte
TijdAandachtBesluit college schuift naar eind oktober
InformatieAandachtVorige rapportage is van 3 juli
KwaliteitOp koersProductie volgens plan
Risico’sAandachtTwee risico’s met een kans van 50% of meer

Mijlpalen

Uit Planning
  • 12 junOntwerp-omgevingsplan ter inzageAfgerond
  • 28 oktBesluit college over de koopovereenkomstBezig
  • 1e kw 2027Start bouwrijp makenGepland

Financiën

Krediet€ 42,0 mlnPrognose€ 41,8 mlnBesteed€ 16,4 mln

De PowerPoint bevat onder meer een dashboard, de planning, de financiën en een risicomatrix.

Example with made-up data

Activities, milestones, decisions and deadlines

A planning per project, with a timeline of all projects and an agenda of what needs to happen when. Whatever is overdue stands out right away.

  • Timeline with phases and milestones
  • Agenda per week and month
  • Making and restoring backups
Planning
202520262027202820292030RivierfrontRivierfront · Planvoorbereiding: jan 2025 – nov 2025Rivierfront · Bouwrijp maken: okt 2025 – aug 2026Rivierfront · Realisatie: mei 2026 – aug 2028Oplevering fase 1 · mei 2027StationskwartierStationskwartier · Planvoorbereiding: mrt 2025 – nov 2026Stationskwartier · Bouwrijp maken: jan 2027 – nov 2027Stationskwartier · Realisatie: sep 2027 – okt 2030Besluit college · okt 2026Start bouw · okt 2027PolderrandPolderrand · Planvoorbereiding: mei 2025 – apr 2027Polderrand · Bouwrijp maken: apr 2027 – mrt 2028Polderrand · Realisatie: jan 2028 – aug 2030Omgevingsplan vastgesteld · jul 2026 · over datumMolenhoekMolenhoek · Planvoorbereiding: aug 2025 – jul 2026Molenhoek · Bouwrijp maken: jul 2026 – mrt 2027Molenhoek · Realisatie: jan 2027 – feb 2029Subsidieaanvraag · okt 2026ParkzoomParkzoom · Bouwrijp maken: jan 2025 – aug 2025Parkzoom · Realisatie: jul 2025 – feb 2027Verantwoording subsidie · nov 2026vandaag
Planvoorbereiding Bouwrijp maken Realisatie Mijlpaal Over datum

Agenda · komende 30 dagen

  • Over datumOmgevingsplan vastgesteldPolderrand · Besluit
  • 28 oktBesluit college over de koopovereenkomstStationskwartier · Besluit
  • 30 oktSubsidieaanvraag indienenMolenhoek · Deadline
  • 20 novVerantwoording subsidieParkzoom · Mijlpaal
Example with made-up data

Every subsidy, deadline and payment monitored

The subsidy register keeps track of applications, conditions, accountability and payments. AI reads a scheme or grant decision and fills in the fields for you.

  • Deadlines for application and accountability
  • Advances and final determination
  • Subsidy risk as a point of attention
Subsidies
Toegekend € 10,0 mlnOntvangen € 5,9 mlnNog te ontvangen € 4,1 mln

Subsidieregister

RegelingProjectBedragStatusVolgende stap
Versnellingsbijdrage woningbouwRijkStationskwartier€ 4,2 mlnToegekendVoortgangsverslag · 1 dec
Bijdrage knooppunt openbaar vervoerProvincieStationskwartier€ 2,6 mlnToegekendTweede voorschot · 15 jan
Programma vitale wijkenRijkRivierfront€ 2,4 mlnToegekendTussenrapportage · 1 mrt
Klimaatadaptatie groen-blauwProvinciePolderrand€ 1,1 mlnAangevraagdBesluit verwacht · 15 dec
Ontwikkelfonds natuurinclusief bouwenEuropaMolenhoek€ 0,5 mlnIn voorbereidingDeadline aanvraag · over 9 dagen
Inrichting openbare ruimteProvincieParkzoom€ 0,8 mlnToegekendVerantwoording · 20 nov

Uitgelezen met AI

beschikking-versnellingsbijdrage.pdf
Regeling
Versnellingsbijdrage woningbouw
Verstrekker
Rijk
Toegekend
€ 4.200.000
Cofinanciering
50%
Einde uitvoering
31 december 2029
Verantwoording
uiterlijk 1 juli 2030

Controleer de velden en sla de subsidie op.

Example with made-up data

RISMAN with a Monte Carlo simulation

Risks from seven perspectives, with probability and impact as minimum, most likely and maximum amount. The simulation gives the S-curve and the reserve at the chosen level of certainty.

  • Up to 50,000 iterations per analysis
  • Reserve at P80 or P90
  • Export to Excel
Risk analysis
Stationskwartier · 8 risico’sSimulatie 10.000 iteratiesReservering P90 · € 4,4 mln

S-curve: kans op een totaalbedrag

80% kans dat de risico’s samen niet meer kosten dan € 3,7 mln

0%25%50%75%100%€ 01 mln2 mln3 mln4 mln5 mln6 mln7 mlnP50P80P90

Wijs de curve aan, of gebruik de pijltjestoetsen.

Risicoregister · grootste verwachte waarde

RisicoKansMin – max
Stijging van de bouwkostenFinancieel-economisch60%€ 0,4 – 2,4 mln
Lagere grondopbrengst door dalende woningprijzenFinancieel-economisch30%€ 0,5 – 3,0 mln
Bodemverontreiniging op het oude spoorterreinTechnisch40%€ 0,3 – 2,0 mln
Bezwaar en beroep tegen het omgevingsplanJuridisch35%€ 0,2 – 1,5 mln
Verleggen van kabels en leidingenTechnisch50%€ 0,1 – 0,9 mln
Example with made-up data

A calculation model under the BBV rules

Sub-areas, residual land value, cash flow and net present value, with scenarios, sensitivity and a BBV check. Pick a scenario below and watch the check move along.

  • Discount rate according to the BBV
  • Check on the ten-year duration
  • Loss provision at a negative NPV
Land development
De vastgestelde grondexploitatie.
Netto contante waarde€ 2,6 mlnPer 1 januari 2026, disconteringsvoet 2%
Resultaat nominaal€ 4,0 mlnOpbrengsten min kosten
Looptijd9 jaar2026 t/m 2034

Kasstroom per jaar

−6−30+3+62026: kosten € 4,6 mln20262027: opbrengsten € 0,6 mln2027: kosten € 6,0 mln2028: opbrengsten € 3,0 mln2028: kosten € 5,2 mln20282029: opbrengsten € 5,0 mln2029: kosten € 3,4 mln2030: opbrengsten € 6,2 mln2030: kosten € 2,2 mln20302031: opbrengsten € 5,6 mln2031: kosten € 1,6 mln2032: opbrengsten € 4,4 mln2032: kosten € 1,1 mln20322033: opbrengsten € 3,2 mln2033: kosten € 0,7 mln2034: opbrengsten € 1,2 mln2034: kosten € 0,4 mln2034mln
Opbrengsten Kosten

BBV-toets

  • In orde: Disconteringsvoet 2%, gelijk aan het BBV
  • In orde: Looptijd 9 jaar, binnen de BBV-termijn van 10 jaar
  • In orde: Geactualiseerd in 2026
  • In orde: Positieve NCW: geen verliesvoorziening nodig
Example with made-up data

The central project overview

Per project the project managers, assistant and civil engineering project managers and order numbers. Linked components and the next step are shown alongside.

  • Linking by order number or name
  • Net present value per project
  • Overview as PDF
Projects
ProjectProjectleidingGekoppeldEerstvolgende stapNCW
Rivierfront73102007310201Sanne VerbeekAssistent: Tim de Bruin · Civiel: Femke MulderRapportage: gekoppeldPlanning: gekoppeldGrondexploitatie: gekoppeldSubsidie: gekoppeldRisicoanalyse: gekoppeldOplevering fase 1€ 2,1 mln
Stationskwartier732010073201107320120Mark de GraafAssistent: Yara Haddou · Civiel: Daan WillemsRapportage: gekoppeldPlanning: gekoppeldGrondexploitatie: gekoppeldSubsidie: gekoppeldRisicoanalyse: gekoppeldBesluit college over de koopovereenkomst€ 2,6 mln
Polderrand7330300Esra YilmazAssistent: Sem Peters · Civiel: Femke MulderRapportage: gekoppeldPlanning: gekoppeldGrondexploitatie: gekoppeldSubsidie: gekoppeldRisicoanalyse: gekoppeldVaststelling omgevingsplan−€ 0,8 mln
Molenhoek7340400Joost HendriksCiviel: Daan WillemsRapportage: gekoppeldPlanning: gekoppeldGrondexploitatie: gekoppeldSubsidie: gekoppeldRisicoanalyse: gekoppeldSubsidieaanvraag indienen€ 0,9 mln
Parkzoom7350500Noor BoualiCiviel: Ruben VosRapportage: gekoppeldPlanning: gekoppeldGrondexploitatie: gekoppeldSubsidie: gekoppeldRisicoanalyse: niet gekoppeldVerantwoording subsidie€ 0,6 mln
Example with made-up data

Budgeted versus actual hours

Budgeted hours per project, employee and year, the monthly import of actual hours and a forecast for the whole year. With utilisation and capacity per employee.

  • Forecast per year or year-to-date
  • Multi-year overview and utilisation
  • Restore points of earlier states
Hours
Begroot 20266.240 uur
Werkelijk t/m september4.590 uur74% van begroot
Prognose einde jaar6.120 uur−2% tegenover de begroting

Per project, heel 2026

  • Rivierfront1.050 / 1.480
  • Stationskwartier1.720 / 2.100 · prognose +9%
  • Polderrand860 / 1.240
  • Molenhoek540 / 820
  • Parkzoom420 / 600
Begroot Werkelijk Prognose einde jaar
Example with made-up data

Collaboration

Working in the same figures, without overwriting each other’s work

Everything is stored centrally in the database, not in separate files or in the browser. Everyone sees the same version.

  • Updated live

    Colleagues’ changes appear within fifteen seconds, without reloading. Whoever is typing is not interrupted.

  • Version control on every save

    If two people save at the same time, nothing is silently lost. The second gets a notification and sees the latest version.

  • Can be restored

    A deleted planning or land development budget can be restored for ninety days. Hours keeps restore points of earlier states.

  • Permissions per tab

    Per colleague: no access, view or edit. For Hours: view, fill in or manage. A tab can also be switched off for everyone.

Permissions per tab
Example of permissions per colleague and tab
ColleagueReportsPlanningLand developmentHours
Mark de GraafProject managerEditEditViewFill in
Lotte KramerProject controllerViewViewEditManage
Ahmed BenaliDepartment managerViewViewViewView
Iris DekkerCommunicationsViewViewNoneNone
Example with made-up names

Who it is for

For everyone working on an area development

  • Project managers

    A report in a fixed structure, with milestones from the planning and autosave. Less copy and paste, more time for the project.

  • Project controllers

    Land development budgets under the BBV rules, risk reserves with Monte Carlo and hours against the budget. Every figure can be traced back to its source.

  • Management

    One dashboard across the entire portfolio, with the points of attention at the top and an agenda of what is coming up.

  • Executive

    A clear report per project with a traffic light per control aspect, as PDF or PowerPoint, ready for the executive or the council.

Security

Security is the starting point, not the finishing touch

Land development budgets, hourly rates and risks are confidential. That is why PPM is locked down from the sign-in all the way to the database.

  • Two-factor authentication required

    Everyone signs in with password and authenticator app, on every sign-in. Remembering a device is not possible.

  • Access after approval

    Only colleagues with an email address of their own organisation can request an account, and the administrator approves every request.

  • Permissions on the server

    What someone may not see, the server does not send to the browser either. Every request is checked again.

  • A log that cannot be erased

    Sign-ins, admin actions and deletions are recorded. The database refuses changes and deletion within the one-year retention period.

  • Strong passwords

    At least twelve characters, checked against known data breaches and stored with scrypt. Repeated failed attempts lead to a lockout.

  • Sessions that expire

    After two hours without activity, or after twelve hours at most, you sign in again. After a new password all other sessions end.

  • Strict web security

    A Content Security Policy with a nonce per request, HSTS and strict headers. No scripts, fonts or trackers from third parties.

  • Secure database

    An encrypted connection with certificate and hostname verification, and only parameterised queries.

Every version is tested with automated end-to-end tests and checked for known vulnerabilities in the packages used.

How we start

From introduction to the first report

  1. Introduction

    We show PPM with sample data and discuss how you report and steer today.

  2. Setup

    We set up your own environment, with your email domain, an administrator and the tabs you use.

  3. Migration

    Together we migrate the projects and existing data. You import budgeted hours from Excel, and actual hours every month from the time export.

  4. Roll-out in small groups

    Colleagues start in groups of two or three: creating an account, linking the authenticator and going through the new way of working.

Frequently asked questions

Good to know

Who is Portfolio Project Management for?

For municipalities developing areas: project managers, project controllers, management and executives. PPM grew out of the daily practice of area development and project control at a municipality.

Do we have to use all tabs?

No. The administrator switches tabs on or off and gives each colleague permissions per tab. You can start small, for example with reports and planning, and expand later.

What happens to our Excel files?

PPM replaces the separate Excel reporting. You import budgeted hours from Excel and actual hours from the time export. The dashboard, risk analysis, planning, land development budgets and Hours export your data back to Excel or CSV.

How does PPM deal with the BBV and RISMAN?

The calculation model for land development follows the BBV (the Dutch budgeting and accounting rules for municipalities). Among other things it checks the discount rate, the duration of in principle ten years and the annual update, and shows a loss provision at a negative net present value. You record risks using RISMAN and calculate them with a Monte Carlo simulation.

Can colleagues work at the same time?

Yes. Changes appear for colleagues within fifteen seconds. If two people save at the same time, PPM refuses the second save with a clear message, instead of silently overwriting the other person’s work.

Where is our data stored?

In a dedicated PostgreSQL database that can only be reached through an encrypted connection. Nothing is stored in the browser, except display preferences such as the chosen view.

What happens to a document when AI reads it?

Only when you click Read with AI yourself does the text of that document go to an external AI service. PPM then only takes over known fields and checks them. Do not upload documents with personal data, and include the feature in your DPIA.

Does it also work on a tablet or phone?

Yes. PPM works in the browser on desktop, tablet and phone, with nothing to install. On a narrow screen the sidebar becomes a drawer and the project matrix a list of cards.

Get acquainted

Curious what PPM could mean for your portfolio?

Book an introduction. We show PPM with sample data and discuss how it fits your projects and way of working.